Supplier vetting · Guangzhou

How to vet a Chinese clothing supplier: 12 checks before you pay

Most bad supplier relationships were visible before the deposit — in a licence, a video call, a question that was answered vaguely. These twelve checks take about ninety minutes and they are the cheapest insurance in this trade.

First, the uncomfortable truth

Roughly half of the companies presenting themselves as garment factories in Guangzhou are trading offices. That is not fraud — a good trading office can be a better partner than a mediocre factory, because it can move between lines. The problem is only when you think you are buying from a factory and you are not, because the price, the lead time and the quality all behave differently than you were told.

So vetting is not about catching liars. It is about knowing which model you are buying, so your expectations match reality.

The 12 checks

1. Business licence, and what it actually covers

Ask for the licence (营业执照) and look at three things: the legal name, the registered address, and the business scope (经营范围). A company whose scope is "wholesale of textiles" is not a manufacturer. The unified social credit code should match what appears on any invoice or PI they send you.

2. Factory or trading office — ask a question only a factory can answer

"How many sewing stations do you have, and how many of them are running today?" A factory answers in numbers and can explain why two lines are idle. A trading office answers "we have a big factory" or changes the subject.

Follow with: "Send me a photo of the production board / 排产表 for this week." A real floor has one, with style numbers and quantities.

3. See the order they are making now — not the sample room

Every factory has a tidy sample room. Ask to see the line running your category: if you are making dresses, you want to see dresses being sewn, not t-shirts. On a video call, ask them to walk from the cutting table to the finishing area without cutting the video.

4. Who makes the pattern, and how big is the sample room

If patterns come from an outside studio, that studio's calendar is part of your lead time. Ask: "How many people are in the sample room, and how many samples do you finish a week?" Two people means your three styles queue behind everything else.

5. Needle detection — the check most small workshops skip

"Do you have a needle detector, and can I see it running?" Broken needles end up in garments more often than factories admit. A workshop without a detector either does not care about metal contamination or does not know it matters — both are a problem if you sell in Japan, the EU or the US.

6. Written inspection standard, not verbal promises

Ask for the inspection terms in writing: measurement tolerance, colour judgment method (lab dip under D65 vs "by eye"), whether inspection is AQL sampling or 100% of pieces, and what happens when a lot fails. A supplier who says "we check everything" and cannot state a tolerance is telling you they have never had this conversation.

7. Where the fabric comes from

"Is the fabric mill stock, market stock, or custom-dyed for this order?" Each has a different minimum and lead time, and the answer decides your real MOQ. Custom dyeing means a 100–300 m dye lot per colour — which is why some quotes cannot go below 300 pieces without changing the fabric.

8. How many tiers are between you and the sewing machine

One subcontracting step is normal and fine. Three is where quality control dies. Ask directly: "Will this order be made here, or sent out? If sent out, where?" Then ask whether they will tell you if that changes. A supplier who gets defensive about this question is answering it.

9. Do they commit to a cutting date, or a delivery promise?

"Production 30 days" is not a schedule. Ask: "What is the cutting date, and what is the inspection date?" Dates on paper can be argued with; "don't worry" cannot.

10. Payment terms

30% deposit and 70% before shipment against the inspection report is standard. Be careful with: 100% up front, payment to a personal account, or a request to send money outside the company name on the PI. None of these have a legitimate reason.

11. A quote with lines, or a single number

Ask for the price split into fabric, CMT, trims, packing, inspection and margin. A supplier who can break it down is quoting a garment; one who cannot is quoting a hope. It also gives you something to negotiate line by line instead of a total.

12. Reference buyers, and whether you can visit

Every serious supplier will let you visit — Guangzhou is not difficult to reach, and seeing the floor answers checks 2, 3, 4, 5 and 8 in twenty minutes. "Our clients are confidential" is a legitimate answer for names; "you cannot visit" is not.

What the answers look like

CheckGood answerEnds the conversation
2 · Stations"62 stations, 48 running, two lines on a reorder""Big factory, many workers"
3 · Current orderScreen share the line, no cuts"Our factory is in another city, no video"
5 · Needle detector"Yes, video coming""Not necessary for this price"
6 · Inspection termsWrites ±1 cm, D65, 100%"We have QC, guaranteed quality"
8 · Subcontracting"Cut here, sewn at our second workshop in Panyu""Everything in-house" then refuses details
9 · DatesCutting 12th, inspection 8th, ETD 11th"30 days, no problem"
11 · QuoteSix lines with numbersOne total, "best price for you"

The five red flags that predict trouble

  1. Answers arrive faster than questions. A quote for a complex style in two hours, before any fabric discussion, is a number invented to keep you engaged.
  2. Every question is answered "yes". Real factories say no to things: a construction their machines cannot do, a fabric they cannot dye, a date they cannot hit. A supplier who never says no has not understood your spec.
  3. Price 30% under everyone else. Either the fabric is not what you approved, the lining is gone, inspection is skipped, or the order will be subcontracted twice.
  4. Pressure to pay quickly. "Price valid only today" on a first order is a sales technique, not a market condition.
  5. No written anything. No PI with terms, no inspection standard, no dates. Everything verbal, everything friendly.

The 90-minute vetting sequence

MinuteWhat you do
0–10Licence + business scope + credit code cross-check with the PI
10–25Video call: stations, current order on the line, sample room size
25–40Needle detector video, inspection terms in writing, fabric origin
40–55Subcontracting question, cutting and inspection dates, payment terms
55–70Quote with six lines; ask which line moves if you change one thing
70–90Ask for a visit slot, or a paid sample with a written tolerance

Our own answers to these twelve checks

We run our own workshop in Baiyun, Guangzhou — the inspection room, finishing and packing floor you can see photographed on the inspection evidence page — and we produce on partner sewing lines we have worked with for years. The address is on every page of this site, and both places are open to a visit.

So the awkward questions get a straight answer: who inspects? We do, in our own room, before anything is packed. Who sews? A partner line, and we name it in the quote. What if it moves? We tell you before it moves, not after.

That split is on purpose. Production capacity can be borrowed; the decision to reject a lot cannot. Keeping inspection in-house means nobody downstream gets to quietly skip a check to protect their own margin.

If you have read the twelve checks above and want to test us against them, send one style. You will see the answers in the sample, the terms and the inspection report — not in a brochure.

Questions we get asked

How do I know if a Chinese supplier is a real factory?

Ask for the business licence and check the business scope covers manufacturing, then ask how many sewing stations they have and request a photo of this week's production board. Finally, ask them to walk a video call from cutting to finishing without cutting the video. Trading offices cannot answer those three consistently.

Is it safe to buy from a trading company instead of a factory?

Often yes — a good trading office can move between lines and manage several small orders better than one factory can. The risk is only when you believe you are buying factory-direct and are not, because price, lead time and quality then behave differently than promised. What matters is knowing which model you are buying.

What is the single most important question to ask?

"What is your cutting date?" It forces a specific schedule instead of "30 days", reveals whether capacity exists, and gives you something to hold them to. A supplier who cannot name a cutting date has not scheduled your order.

How much deposit is normal in China?

30% on order confirmation and 70% before shipment against the inspection report, by T/T to the company account named on the PI. Be cautious with 100% up front, personal accounts, or payment to a name that does not match the invoice.

Should I use a third-party inspection company?

For a first order above a few thousand dollars, yes — SGS, BV, Intertek and QIMA all operate in Guangzhou. It costs a few hundred dollars and gives you an independent record. A supplier who resists third-party inspection is telling you something.

How long does proper vetting take?

About ninety minutes of questions and video, plus a sample round. The expensive errors — wrong fabric, skipped inspection, a subcontractor two tiers down — are all visible in that ninety minutes, which is why it is the highest-return time you will spend on sourcing.

Request a quote

Four fields is enough to get a price.

Tell us what you want to make and how many pieces. You get FOB price, MOQ and a realistic lead time — answered by Belinda within one working day.

  • 50 pieces per style; no minimum on the first conversation
  • A photo, a sample or a full tech pack — all fine
  • Your details stay with us — no mailing list